Soil Solutions HMR was the remediation contractor on the Quest Technologies construction project in Clifton, NJ to treat over 25,000 tons of lead-contaminated urban fill. We created the ex-situ soil treatment plan (STP), managed all chemical delivery logistics and onsite storage, and supervised soil processing. Nordic Construction supplied excavation and loading equipment for soil handling and management. After successful treatment, the soils were sampled, reclassified as non-hazardous, and transported by dump trailer to disposal and re-use sites as daily cover material at a nonhazardous NJ landfill.
- SSHMR remediation 1,000 – 1,500 tons of contaminated soil per day.
- No extra heavy equipment needed, providing substantial cost savings.
- Reclassification of treated material as nonhazardous on site, avoiding the paperwork, hassle and charges of hazardous disposal.
- TCLP baseline: 65 mg/l to 105 mg/l. TCLP treated: <0.1mg/l to ND.
Why Soil Solutions?
The Trusted Remediation Provider of the Northeast
We’re the Northeast’s most trusted soil remediation firm because we do it right. In 20+ years in the field and 200+ projects, we have a 100% success rate.
Featured Projects

Quest Technologies
Construction Site
Clifton, New Jersey
Quest Diagnostic Headquarters
Soil Solutions HMR was the soil remediation contractor for Quest Diagnostic Headquarters in New Jersey- treating 25,000 tons of lead-contaminated soil

U. S. Forest
Service / Environmental
Contractors, Inc.
Warren, New Hampshire
Ore Hill Mine Site Restoration
Soil Solutions HMR treated the CERCLA abandoned mine tailings in Ore Mine Site Warren, NH ex-situ treatment of 50,400 tons of lead and zinc impacted soil.

ConocoPhillips / URS
/ Clean Harbors
South Weymouth,
Massachusetts
Weymouth Neck Project
Soil Solutions HMR provided in-situ treatment and processing of arsenic and lead-bearing soil at Weymouth Neck (Conoco Phillips, URS, Clean Harbors)

American Optical Corp.
Southbridge, Massachusetts
Settling Lagoon Solidification
Soil Solutions HMR was contracted for the solidification of Lead impacted sediments in a settling lagoon at the American Optical facility in Massachusetts.
.jpg)
Massachusetts Institute of Technology (MIT)
Cambridg, Massachusetts
MIT Housing Project
Soil Solutions HMR provided in-situ chemical fixation for MIT's Lansdowne Street New Housing and Construction project building on lead-impacted soils.

Massachusetts Highway Department
Worcester, Massachusetts
Route 146 Extension Project
Massachusetts Hwy Dept contracted Soil Solutions HMR for ex-situ chemical fixation on lead-impacted soils in the extension of Route 146 in Worcester.

Boston Redevelopment Authority (BRA)
South Boston, Massachusetts
Boston Convention Center Project
The Boston Redevelopment Authority contracted Soil Solutions HMR for the Boston convention center during the Big Dig in Boston, conducting ex-situ thermal desorption and chemical fixation.
Get A Quote or Evaluation